A recovery time typed into a spreadsheet is a promise nobody has checked.

How it works

  1. 01

    Add up the procedures

    Durations and links become a calculated timeline.

  2. 02

    Check the objective

    The result reads Within, Exceeds or No objective defined.

  3. 03

    Slide a duration

    Watch the end time and the critical chain change.

What you get

  • Within, Exceeds or No objective defined, stated plainly.
  • Slide a duration and watch the end time and the critical chain change.
  • An incomplete plan says so. It never claims a pass.
833 of 833

recovery start times matched the previous eBRP Suite calculation.

Verified on a 217-plan test dataset.

Try the what-if slider.

Change the duration of one step and watch the end time and the critical chain move.

Within the 4 h objective by 15 min.

Demo plan with sample durations. Not customer data.

See eRMA v10 live in 20 minutes.Book a demo